The First Step is to build 50+50MW
Nova-Eco initially plans to install 20-25 turbines, build collection grid, repair and maintenance base and wind power park infrastructure, 220 kV overhead transmission line and interconnection substation in
the Eastern Site (Lenino District), then adding another 20-25 wind turbines to reach the total installed capacity of 100MW